jbj Techniques Limited & the BLOODHOUND SSC project

an excellence in engineering connects to . . . Setting up test rig inside old MOD hangar in Newquay, Cornwall. Fuel tank. For the test it contains water to be pumped through at the same speed and pressure that fuel will be pumped during the actual land speed record attempt. This flange connects to the pipeline seen here above. This is the fuel line.

RkJQdWJsaXNoZXIy NzQyNjQ=